The purpose of the Kuching Public Transportation study was to prepare a Long Term Masterplan together with Short and Medium Term Plans for improving and
The project involved construction of: 2-cast in-situ single box prestressed flyovers with constant depth of 1.6m (Overpass A with 10 spans of 22m+8x24m+22m and Overpass
This project is the first of its kind in the State whereby a multi-level shallow underpass is constructed beneath existing roundabout at Petra Jaya. The