The Proposed Muara Lassa Bridge is located about 3.2km upstream from the existing ferry point which connects Daro and Matu to Tanjung Manis in Mukah Division, via Pulau Bruit.
Client: Government of Sarawak
Date of Commencement: 22 March 2019
project details
The proposed bridge is a 2-lane single carriageway bridge with full multiple spans of Balanced Cantilever Cast In-Situ Box Girder together with approach road designed in accordance with JKR R5 standard. The bridge total length over water is approximately 2.43km with no intermediate movement joints throughout the entire bridge. Movement joint is provided at the bridge ends at abutments only.
The two main spans (each with 200m long) of the bridge provide navigation clearance of 120m width x 20m height (on each side).
Get in touch with our specialist engineers to discuss about your prospective projects and we will advise how we can best service your needs and add value to your proposition.